Image:TBM S-210 Alptransit Faido East.jpg

Un article de Wikipédia, l'encyclopédie libre.

Ci-dessous, retrouvez page de description du fichier provenant de Commons.

[edit] Summary

Description

Head of the S-210 Tunnel boring machine used to excavate the eastern tube of the Gotthard Base tunnel between Bodio and Faido, Canton Ticino, Switzerland
(all roll chisels have already been removed, picture taken 10 days after breakthrough into multi-function station Faido, 2000 m of rock overhead, diameter is 8.80 m / 29 ft., length of the TBM is 400 m / 1312 ft.)

Source

own work

Date

Sept. 16 2006

Author

Cooper.ch 16:58, 19 September 2006 (UTC)

Permission
(Reusing this image)

hereby released under CC-BY-SA-2.5


[edit] Licensing

I, the copyright holder of this work, hereby publish it under the following license:
Creative Commons License
Creative Commons Attribution iconCreative Commons Share Alike icon
This file is licensed under the Creative Commons Attribution ShareAlike 2.5 License. In short: you are free to share and make derivative works of the file under the conditions that you appropriately attribute it, and that you distribute it only under a license identical to this one. Official license

Historique du fichier

Cliquer sur une date et une heure pour voir le fichier tel qu’il était à ce moment-là

Date et heureDimensionsUtilisateurCommentaire
actuel19 septembre 2006 à 18:581 600×1 200 (552 Kio)Cooper.ch ({{Information |Description=Head of the S-210 Tunnel boring machine used to excavate the eastern tube of the Gotthard Base tunnel between Bodio and Faido, Canton Ticino, Switzerland (all roll chisels have already been removed, picture taken 10 days after b)